PC Deployment at Red Wing PL

02-13-2008  MGF  The 5 new computers have been delivered to Red Wing and installed with pharos.  The system that they wanted re-configured as a staff system has been reloaded and re-deployed.  This concludes this project.

02-06-2008  MGF  I have gotten the system back and have created the master public image for Red Wing and have begun imaging the boxes with it.  Randy is going to send us a former public box that he will replace with one of these new systems to setup as a staff system, waiting to get the system back from Randy to setup.

02-04-2008  DRL  Mike has created the basic image and loaded it onto one of the five PCs.  He sent this PC back to Red Wing for Randy to load with site-specific settings and software.  Randy will send it back when he is finished and we will make a new image to be loaded onto the other four PCs.  Randy is very good about letting us know what he is doing and making sure we have the opportunity to update our image so this cooperating works out well for both SELCO and Red Wing PL.  There is no timeline on when we will get the PC back from Randy but it will probably be this week.

01-23-2008  DRL  Red Wing PL has purchased five replacement PCs.  We will deploy these to replace five public systems.  The first PC has arrived in Delivery; we will use this create a master image that will be copied to the other four.  This project was created in response to Help Desk ticket #014529.

Events Calendar
«          December 2008          »
Su Mo Tu We Th Fr Sa
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
 

Powered by Plone, the Open Source Content Management System

This site conforms to the following standards: